February 17th Workday

It was a very cold day but an important one for the club. As discussed in the newsletter, the club is building an additional unloading / loading area. During the day, the transfer table rails were bolted and welded to the pad. After that, the transfer table was moved over to the new area.

While one team worked on the transfer table, another was installing the connection ramps to the new retaining wall over by the trailer unloading area. The new wall was slightly closer to the table then the old wooded one, so adjustments had to be made.