January 14 Workday

With all the track panels built and switches refurbished, it was time to get all this put back together. It was a very cold start to the workday but it finally got a little warmer as the day went on. We had a great turnout for the workday and got a lot accomplished.

The original configuration of the switches was changed slightly to eliminate as many s-curves as possible. Due to the configuration changes, the parking tracks were extended by at least 10 feet, with one getting an extra 30 feet.