April 16 Workday

The first project of the workday was to get Station Track #2 back in action before the Spring Meet. The track was raised slightly (to align with the other two tracks) and leveled. Additionally, the switches before the area were gravel, leveled, and tested. These tracks are very important to track operations so a lot of care was given to this area.

Later in the day, a lot of time was spent filling in the areas between the tracks in the steaming bay yard. There is still more gravel to add to this area but some amazing progress was made today!