September 28 Worday

During the Fall Meet, it was discovered that the track outside the tunnel had sustained some damage. While this damage did not cause too many issues during the meet, it needed to be repaired. After closer inspection by the track crew, the decision was made to replace all the track and ties in the tunnel, as this had not been done in a long time. The track crew worked very hard and the results look amazing.