August 8 Workday

Over the summer, a number of heat kinks have developed around the track. It took about an hour, but three of the major ones have been repaired. On the next workday, final corrections will be made and areas will have more gravel added.

In the coming weeks, the club is going to re-gravel the area from the street to the unloading area. During this time, we will also replace two storage sidings. These sidings were in bad shape and the ground is very uneven.  Since there will be skid steer on site for the gravel installation, replacing these tracks seemed like a good idea.

Also, a switch was removed from the unloading track ramp to allow equipment access to the steaming bay area for a couple of weeks.