November 11 - Yard Work

Continuing the work from the November 4th work day, the next step was to re-level Conner Yard before the new yard tracks are installed. The roadbed for the yard needed to reduced in height by 3 inches so it will match the mainline on the left. Since the area has not been disturbed in 30+ years, a little heavy equipment was needed to move the compacted gravel. Huge thanks to Mike Bassham for getting us a Skid Steer to complete the job.